CONSTRUCTION WORKS FOR THE LINE OF EXISTING UNIVERSITY STATION – OMU CAMPUS IN SAMSUN LIGHT RAIL SYSTEM

CONSTRUCTION WORKS FOR THE LINE OF EXISTING UNIVERSITY STATION – OMU CAMPUS IN SAMSUN LIGHT RAIL SYSTEM

IN Tram Line
Investor Name:
Metropolitan Municipality Of Samsun Scope Of Work: Construction Work Of Light Rail System
Published Date:
23 November 2018
Location:
Samsun / Ondokuz Mayis University / Inside The Campus
Value:
Architecture:
About Project

The following works have been completed within the scope of the project:

  • Construction of Light Rail Line with a total length of 5177 m connecting the existing Üniversite Station to the Campus of Ondokuz Mayıs University
  • 7 Stations (Stops)
  • Manufacturing of steel overpass with a length of 295 meters (112 m left + 108 m right and 75 m main connection) and escalators on it
  • 114 m Tube Box (Between Steel Overpass and Faculty of Medicine)
  • 194 Catenary Poles
  • 30000 pcs of Ri60 Rail Connection Set
  • Casting catenary materials
  • Line Signaling for Light Rail System
  • 8 Point Machines

Route Rail Works:

Quantity of Railway: 10354 track-m

Number of turnouts:

  • 1\6 curved R=50 crossover: 1 piece
  • 1\6 curved R=100 single turnout (with electric motor): 6 pieces
  • 1\6 curved Crossing: 1 piece