CONSTRUCTION OF EXTENSION, CONNECTION, AND ADDITIONAL DEPOT AREA TRACKS FOR ESKİŞEHİR TRAM

CONSTRUCTION OF EXTENSION, CONNECTION, AND ADDITIONAL DEPOT AREA TRACKS FOR ESKİŞEHİR TRAM

IN Tram Line
Investor Name:
Eskişehir Metropolitan Municipality - Department Of Transportation
Published Date:
20 December 2018
Location:
Eskişehir
Value:
Architecture:
About Project

Location Of Work:

  • 71 Evler-Şehir Hastanesi-Sultandere,
  • Opera-Otogar,
  • Opera-Kumlubel,
  • Yıldız-Opera,
  • Köprübaşı,
  • Estram Additional Depot Area Tracks

The Following Works Have Been Completed Within The Scope Of The Project;

Construction Of The Railway Route With A Total Length Of 17515 Meters Including 12278-Meter Double-Track Line And 5237-Meter Single- Track Line And Street Tramline With A Length Of 29795 Meters

  • 20 Stations (36 Platforms) – 43 Switches 13 Crossings
  • 626 Catenary Poles
  • 90000 Pcs Of Ri60 Rail Connection Set
  • Casting Catenary Materials
  • Line And Depot Area Signaling For Light Rail System
  • 15 Point Machines